Sr. Project Engineer – Mechanical and Piping (MMS)
Location: AIM Project – Morowali
Requirements:
- Meet all the requirements for Health, Safety, and Work Environment of PT MMS which refers to the Decree of the Minister of Energy and Mineral Resources Number 1827.K/30/MEM/2018 Decree of the Director-General of Mineral and Coal Number 185.K/37.04/DJB/2019 and regulations other related.
- Have a POP certificate, POM is more preferred.
- Male / Female, maximum 45 years.
- Formal Education: Bachelor’s degree in Mechanical/Naval/Marine Engineering.
- Experienced in Oil & Gas / Mining Construction or Operation for mechanical & piping, with minimum of 3 years as Superintendent or 10 years as Senior Engineer.
- Develop Project Objectives and Specifications for all required tools and equipment.
- Involve and assist Project Manager in planning and forecast of budgets and timeline to assure project completed OTOBOS.
- Collaborates with the engineer, cross department and stakeholder to develop design, efficient methods and practices.
- Provide technical direction for all Engineering works from contract award to commissioning phase.
- Maintain and record an effective quality system to ensure all records, test results and inspections required under the contracts are obtained.
- Have the ability to be a strategic planner.
- Willing to work under pressure and long hours (if required).
- Have a combination of skills including an ability to ask penetrating questions, detect unstated assumptions and resolve conflicts, as well as more general management skills.
- Have good emotional intelligence, especially in a high-strung environment.
Submit your application with updated CV and relevant files in PDF (Max 6 MB) and write position code – name (example: SPE – MMS – Adam Putra) and apply to: sadrak@merdekacoppergold.com before October 30th 2022.